HOME
Business Contents
Contact
SLSCREATION Co., Ltd
Company Profile
ENRC
JAPANESE PAGE
|Business description
航空事業
空間情報事業
flight procedure design
flight procedure design
When an obstacle is installed, it is determined work the safety of air routes
Safety assessment of air routes
If the obstacle may be exposed to danger in the air route,
it is the job considering the altitude and route change of flight.
Temporary change of air route
Our job is to propose AIP draft such as flight path, altitude and speed.
AIP creation
Provides basic education for "flight procedure design".
Basic education of flight procedure design
It is a job to support for filling out CAB documents for installation on air routes such as buildings, drones (UAV).
When placing obstacles on the flight path,
Support for filling out CAB documents
Way of airplane?
It is often thought that airplanes are flying freely in the sky, but in the sky, the road called "air route" is like a net. The airplane is using this "air route" to its destination.
The design of fly safely the road from each airport to the airway is flight procedure design. The designed flight path will be announced to the AIP, detailing the safest altitude, turning point, height, speed, etc., by the CAB.
Safety assessment of air routes?
We will ensure the safety of the flight when the aircraft passes over the air route such as buildings around the airport, fireworks, crane work, UAV (drone) flight, etc. and check in advance whether it will affect the flight.
Protects airports around the country so that airplanes do not collide with obstacles.
Temporary change of air route?
In the safety assessment, if it is determined that the flight will be affected, NOTAM will notify you of the change.
NOTAM is a kind of aviation information, and it is information about settings, status, changes, etc. related to aviation facilities, operations, methods and dangers.
NOTAM aims to inform airlines and pilots of the above information, and the content of that information is mainly temporary and short-term. Permanent changes can be found in the AIP Amendments and long-term information can be found in the AIP Supplements.
AIP?
Because traffic signs, such as one-way traffic and route guidance, cannot be placed on airways, the Japanese CAB provides operators around the world who fly in Japan with operational information essential for safe operation.
AIP (Aviation Information Publishing), which contains permanent information required for aircraft operation, is issued by CAB.
Our job is to think about AIP drafts.
flight procedure design?
Engineers who design air routes are called "flight procedure designer".
To become a "flight procedure designer", either:
・ Take a curriculum at a company designated by ICAO.
・ Take initial training for "flight procedure designer" conducted by CAB.
We provide basic education service of "flight procedure designer" so that you can understand ICAO and CAB lectures.
Application documents?
When flying an unmanned aerial vehicle or setting up a building near the airport, the CAB is required to apply for documents to check whether it will protrude above the restricted surface.
Regarding horizontal surface, conical surface and outer horizontal surface, depending on the application, it is possible to install a temporary object etc. on the restricted surface.
The safety evaluation of obstacles around the airport has been requested by CAB, and the "flight procedure designer" performs the safety evaluation. Applications submitted to CAB have been safety-rated by our aviation division.
I-CONSTRUCTION with UAV
Conduct a survey using UAV.
I-CONSTRUCTION?
Work to create design drawings and construction drawings with 3DCAD.
"BIM" Design, construction and management of buildings more efficiently
Build an unmanned aircraft control system (UAV Traffic Management)
UAV Traffic Management System (UAV Traffic Management)
Do surveying and video with UAV (drone).
UAV Survey ・ Drone Video
Support the creation of a drone flight permit application and the creation of a flight plan.
Apply for flight plan permission application to CAB
Support for filling out documents when applying
BIM?
BIM (Building Information Modeling) is a mechanism that reproduces the same three-dimensional model of a building as it is on a computer and uses it for building.
In addition to width, depth, and height, building material parts include materials and assembling processes, so that much data other than drawings can be extracted. Structural input and equipment can be reproduced. Since the equipment number, manufacturer, price, etc. can be entered in detail for equipment, it can also be used for maintenance and material management.
UTM?
Utilizing the experience and knowledge of our aviation division, we are developing a system to control the position of unmanned aircraft and manned aircraft, and designing unmanned aircraft airspace.
We believe that there is an urgent need for unmanned aeronautical traffic control that considers air and ground safety, utilizing our extensive knowledge of manned aircraft airspace design.
Where you can fly?
We provide civil engineering surveying services ranging from precise surveying to drone aerial photography and 3D data processing.
In the construction-related field, we provide customers with aerial images that are delighted by buyers, such as construction site process management and building construction process site management.
We provide services that allow inspection of solar panels, PR videos and editing of local governments, and shooting of anniversaries only from the sky.
Application documents?
In the Aircraft Division Airway Safety Assessment, in accordance with ICAO (International Civil Aviation Organization) standards, apply for the UAV (Drone) flight around the airport, making use of the knowledge of the Aviation Division, which conducts airway safety assessment, and create an application form Let us help you create your flight plan and we'll do our best to help.
“CIM” to improve the efficiency of the entire civil engineering business
CIM?
CIM (Construction Information Modeling / Management) introduces a 3D model from the survey design stage, and cooperates and develops a 3D model at each stage of construction and maintenance to improve the efficiency of a series of construction production systems. Aim for The introduction of CIM is expected to have the effect of accelerating consensus building, improving work efficiency, improving quality, and improving productivity through business transformation and front-loading by moving from 2D drawings to 3D models.
Civil engineering work that creates design drawings and construction drawings using 3DCAD.
Copyright © SLSCREATION All Rights Reserved.
We're sorry, but we do not accept telephone inquiries. Click here to contact.
SLSCREATION Co., Ltd
5F, Parking Solutions Fukuoka Office, 1-14-1
Nanokawa, Minami-ku, Fukuoka 815-0081 Japan
TEL:+81-92-982-0705 FAX:+81-92-982-0706
Privacy Policy
Site Map